Project 23 kV M.V. line SpacerCab S/E Lautaro - Lousiana Pacific plant

To carry out this project we proceeded to define the conceptual engineering and then basic and detailed engineering, which consisted of the construction of the M.V. 23 kV Spacer Cab line. To provide the client with a power of 8 MVA, Lautaro.

Amount InvestmentDatePlace
$233.883.736August 2007Sector Lautaro, commune of Lautaro, province of Cautín, Region of the Araucanía, Chile

New panel extension project, Chonchi Substation

Conceptual engineering and detailed engineering was carried out for a new 110 kV substation panel, Chonchi.

Amount InvestmentDatePlace
$246.500.000September and November 2007Chonchi Commune, Chiloé province, Los Lagos Region, Chile

New layout project, 10 km of 110 kV HV line, Chonchi.

Detailed engineering and topographical survey of 10 km for a new layout of the 110 kV transmission line feeding the primary substation, Chonchi.

Amount InvestmentDatePlace
$350.000.000November and December 2007Chonchi Commune, Chiloé province, Los Lagos Region, Chile

Project for the installation of three 500 kVa auto-transformers

Installation of 500 kVa single-phase 23/13.2 kV auto-transformers and 500 kVa three-phase 23/13.2 kV auto-transformers to supply the Universidad Austral de Chile, Valdivia.

Amount InvestmentDatePlace
$70.136.884December 2007Valdivia Commune, Valdivia Province, Los Ríos Region, Chile

Project to relocate transformers and extend low voltage networks to general distribution boards, Watts plant.

A project was carried out to relocate transformers inside the Watts plant, including the extension of the low voltage networks underground, up to the existing conduit inside the plant until reaching the General Distribution Boards. Osorno.

Amount InvestmentDatePlace
$185.761.679January 2008Osorno Commune, Los Lagos Region, Chile

Interconnection project for the Orafti - Pemuco Generation Plant

Detailed engineering was carried out for the interconnection of the Orafti - Pemuco plant as PMGD, Pemuco.

Amount InvestmentDatePlace
$126.246.263March 2008Commune of Pemuco, province of Ñuble, Bío Bío Region, Chile

Power supply, works and auxiliary services project for the Neltume Choshuenco project.

Conceptual and basic engineering of the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Neltume.

Amount InvestmentDatePlace
$2.292.212.210March, April and May 2008Neltume, Chosuenco and Puerto Fuy Sector, Panguipulli Commune, Valdivia Province, Los Ríos Region, Chile

Project to connect the El Trueno hydroelectric power plant to the SIC.

Conceptual and basic engineering was carried out for the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Valdivia.

Amount InvestmentDatePlace
$1.377.368.921April and May 2008Lautaro Commune, Cautín Province, Araucanía Region, Chile

Picarte Sur and Schneider feeder improvement project.

Conceptual and basic engineering was carried out for the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Valdivia.

Amount InvestmentDatePlace
$90.472.375February 2008Valdivia Commune, Valdivia Province, Los Ríos Region, Chile

Basic engineering project for 23, 110 and 220 kV networks to supply the LNGP plant in Mejillones.

Basic engineering was carried out for 4 km of 23 kV distribution line, 10 km of 110 kV transmission line and 10 km of 220 kV transmission line in the Mejillones district, to supply the new LNGP plant. Mejillones

Amount InvestmentDatePlace
$3.718.716.920June and July 2008Mejillones Commune, Antofagasta Province, Antofagasta Region, Chile

Ripley Puerto Montt Project

The MV power supply was designed and built for the 23 kV, 2 MVA supply for the Ripley shops, installing a Whipp & Bourne three-phase recloser, a 182 m insulated cable connection and the installation of line, protection and medium voltage switchgear, Puerto Montt.

Amount InvestmentDatePlace
$60.513.145February 2007Mall Costanera, Puerto Montt Commune, Los Lagos Region, Chile

Chamiza Autotransformer relocation project

This project consisted of basic and detailed engineering, which consisted of changing the insulation of the existing installations (13.2 kV / 23 kV Medium Voltage Line), Quillape-Lenca.

Amount InvestmentDatePlace
$30.935.595July 2007Quillape-Lenca Sector, Puerto Montt Commune, Llanquihue Province, Los Lagos Region, Chile

Specification for portable S/E CGE Transmission 30 MVA 111/CG/24,5 - 23 - 15 - 13,2 kV

Definition of connection scheme and hybrid insulation with temperature rises according to the insulation class for the substation forming sections. Definition of electrical parameters.

Amount InvestmentDatePlace
US$1.200.0002006Mall Costanera, Puerto Montt Commune, Los Lagos Region, Chile

Standardisation of pre-assembled aluminium LV network

The standardisation of the low voltage distribution network using pre-assembled aluminium cables was developed. Along with this, an instruction manual with project criteria and a construction manual for this network was produced and presented to SAESA personnel and its contractors, Osorno.

Amount InvestmentDatePlace
January, February, March and April 2007Osorno Commune, Osorno Province, Los Lagos Region, Chile

Standardisation of MV network in compact protected aluminium or Spacer Cab arrangement

The standardisation of the medium voltage distribution network using aluminium cables protected in compact layout was developed for the companies of the SAESA group, making it possible to transport more power in less space and increasing the quality of service of the existing networks, Osorno.

Amount InvestmentDatePlace
October, November and December 2007Osorno Commune, Osorno Province, Los Lagos Region, Chile

Standardisation of single-phase and three-phase overhead splices

The standardisation of the different types of overhead connections was developed, depending on the power and voltage, for three-phase and single-phase consumption, Osorno.

Amount InvestmentDatePlace
Mayo, Junio, Julio y Diciembre 2007Osorno Commune, Osorno Province, Los Lagos Region, Chile

Undergrounding of Yerbas Buenas street between Vicente Pérez Rosales and Yungay.

A quotation was made for the undergrounding of the medium and low voltage lines in the streets mentioned, Valdivia.

Amount InvestmentDatePlace
$41.769.000May 2007Valdivia Commune, Valdivia Province, Los Ríos Region, Chile

Undergrounding of the city centre, Ramírez Street

The project was carried out for the undergrounding of the medium and low voltage lines in Ramírez Street, between Matta and Cochrane, for which the design of underground vaults was carried out, to house up to 2 transformers of 1 MVA, Osorno.

Amount InvestmentDatePlace
$1.200.000.000January 2007Osorno Commune, Osorno Province, Los Lagos Region, Chile

Undergrounding of the city centre, Antonio Varas Street

The project for the undergrounding of the medium and low voltage lines in Antonio Varas street, between Lota and Germania, was carried out, for which the design of underground vaults was made, to house up to 2 transformers of 1 MVA. Puerto Montt.

Amount InvestmentDatePlace
$4.000.000.000February 2007Commune of Puerto Montt, province of Llanquihue, Los Lagos Region, Chile

23 kV EW feeder cabling system, Compañía Minera Barrick Zaldivar

Basic and detailed engineering was developed for the replacement of the Zaldivar main S/E feeders with 23 kV cables. Antofagasta

Amount InvestmentDatePlace
$1.500.000.000June and July 2008Domeyko mountain range, Antofagasta province, Antofagasta Region, Chile

CGE Power Transformer Specification

Specification of several transformers of 110 / 23 - 15 - 13.2 kV 30 MVA and 66 / 23 - 15 - 13.2 kV for CGE Transmission facilities.

Amount InvestmentDatePlace
$3.000.000.000

Dismantling supervision and diagnostics for SQM

Basic and detailed engineering was developed for the replacement of the Zaldivar main S/E feeders with 23 kV cables. Antofagasta

Amount InvestmentDatePlace
$500.000.000

CONTACT

Av. Nueva Providencia 1945, Office 807 – Providencia, Santiago of Chile

📠 Phone (+56 2) 22476003 (+56 2) 33401836 – 📲 Cellphone (+56 9) 8351 9293

contacto@electrodharma.com

© 2024 ELECTRODHARMA. All rights reserved