PROJECTS
ElectroDharma has a long trajectory record in highly complex projects.
Project 23 kV M.V. line SpacerCab S/E Lautaro - Lousiana Pacific plant
To carry out this project we proceeded to define the conceptual engineering and then basic and detailed engineering, which consisted of the construction of the M.V. 23 kV Spacer Cab line. To provide the client with a power of 8 MVA, Lautaro.
Amount Investment | Date | Place |
---|---|---|
$233.883.736 | August 2007 | Sector Lautaro, commune of Lautaro, province of Cautín, Region of the Araucanía, Chile |
New panel extension project, Chonchi Substation
Conceptual engineering and detailed engineering was carried out for a new 110 kV substation panel, Chonchi.
Amount Investment | Date | Place |
---|---|---|
$246.500.000 | September and November 2007 | Chonchi Commune, Chiloé province, Los Lagos Region, Chile |
New layout project, 10 km of 110 kV HV line, Chonchi.
Detailed engineering and topographical survey of 10 km for a new layout of the 110 kV transmission line feeding the primary substation, Chonchi.
Amount Investment | Date | Place |
---|---|---|
$350.000.000 | November and December 2007 | Chonchi Commune, Chiloé province, Los Lagos Region, Chile |
Project for the installation of three 500 kVa auto-transformers
Installation of 500 kVa single-phase 23/13.2 kV auto-transformers and 500 kVa three-phase 23/13.2 kV auto-transformers to supply the Universidad Austral de Chile, Valdivia.
Amount Investment | Date | Place |
---|---|---|
$70.136.884 | December 2007 | Valdivia Commune, Valdivia Province, Los Ríos Region, Chile |
Project to relocate transformers and extend low voltage networks to general distribution boards, Watts plant.
A project was carried out to relocate transformers inside the Watts plant, including the extension of the low voltage networks underground, up to the existing conduit inside the plant until reaching the General Distribution Boards. Osorno.
Amount Investment | Date | Place |
---|---|---|
$185.761.679 | January 2008 | Osorno Commune, Los Lagos Region, Chile |
Interconnection project for the Orafti - Pemuco Generation Plant
Detailed engineering was carried out for the interconnection of the Orafti - Pemuco plant as PMGD, Pemuco.
Amount Investment | Date | Place |
---|---|---|
$126.246.263 | March 2008 | Commune of Pemuco, province of Ñuble, Bío Bío Region, Chile |
Power supply, works and auxiliary services project for the Neltume Choshuenco project.
Conceptual and basic engineering of the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Neltume.
Amount Investment | Date | Place |
---|---|---|
$2.292.212.210 | March, April and May 2008 | Neltume, Chosuenco and Puerto Fuy Sector, Panguipulli Commune, Valdivia Province, Los Ríos Region, Chile |
Project to connect the El Trueno hydroelectric power plant to the SIC.
Conceptual and basic engineering was carried out for the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Valdivia.
Amount Investment | Date | Place |
---|---|---|
$1.377.368.921 | April and May 2008 | Lautaro Commune, Cautín Province, Araucanía Region, Chile |
Picarte Sur and Schneider feeder improvement project.
Conceptual and basic engineering was carried out for the best alternative from the technical and economic point of view, for the layout of 22 km of medium voltage line (23 kV) in double circuit and 20 km of medium voltage line (23 kV) in single circuit, Valdivia.
Amount Investment | Date | Place |
---|---|---|
$90.472.375 | February 2008 | Valdivia Commune, Valdivia Province, Los Ríos Region, Chile |
Basic engineering project for 23, 110 and 220 kV networks to supply the LNGP plant in Mejillones.
Basic engineering was carried out for 4 km of 23 kV distribution line, 10 km of 110 kV transmission line and 10 km of 220 kV transmission line in the Mejillones district, to supply the new LNGP plant. Mejillones
Amount Investment | Date | Place |
---|---|---|
$3.718.716.920 | June and July 2008 | Mejillones Commune, Antofagasta Province, Antofagasta Region, Chile |
Ripley Puerto Montt Project
The MV power supply was designed and built for the 23 kV, 2 MVA supply for the Ripley shops, installing a Whipp & Bourne three-phase recloser, a 182 m insulated cable connection and the installation of line, protection and medium voltage switchgear, Puerto Montt.
Amount Investment | Date | Place |
---|---|---|
$60.513.145 | February 2007 | Mall Costanera, Puerto Montt Commune, Los Lagos Region, Chile |
Chamiza Autotransformer relocation project
This project consisted of basic and detailed engineering, which consisted of changing the insulation of the existing installations (13.2 kV / 23 kV Medium Voltage Line), Quillape-Lenca.
Amount Investment | Date | Place |
---|---|---|
$30.935.595 | July 2007 | Quillape-Lenca Sector, Puerto Montt Commune, Llanquihue Province, Los Lagos Region, Chile |
Specification for portable S/E CGE Transmission 30 MVA 111/CG/24,5 - 23 - 15 - 13,2 kV
Definition of connection scheme and hybrid insulation with temperature rises according to the insulation class for the substation forming sections. Definition of electrical parameters.
Amount Investment | Date | Place |
---|---|---|
US$1.200.000 | 2006 | Mall Costanera, Puerto Montt Commune, Los Lagos Region, Chile |
Standardisation of pre-assembled aluminium LV network
The standardisation of the low voltage distribution network using pre-assembled aluminium cables was developed. Along with this, an instruction manual with project criteria and a construction manual for this network was produced and presented to SAESA personnel and its contractors, Osorno.
Amount Investment | Date | Place |
---|---|---|
– | January, February, March and April 2007 | Osorno Commune, Osorno Province, Los Lagos Region, Chile |
Standardisation of MV network in compact protected aluminium or Spacer Cab arrangement
The standardisation of the medium voltage distribution network using aluminium cables protected in compact layout was developed for the companies of the SAESA group, making it possible to transport more power in less space and increasing the quality of service of the existing networks, Osorno.
Amount Investment | Date | Place |
---|---|---|
– | October, November and December 2007 | Osorno Commune, Osorno Province, Los Lagos Region, Chile |
Standardisation of single-phase and three-phase overhead splices
The standardisation of the different types of overhead connections was developed, depending on the power and voltage, for three-phase and single-phase consumption, Osorno.
Amount Investment | Date | Place |
---|---|---|
– | Mayo, Junio, Julio y Diciembre 2007 | Osorno Commune, Osorno Province, Los Lagos Region, Chile |
Undergrounding of Yerbas Buenas street between Vicente Pérez Rosales and Yungay.
A quotation was made for the undergrounding of the medium and low voltage lines in the streets mentioned, Valdivia.
Amount Investment | Date | Place |
---|---|---|
$41.769.000 | May 2007 | Valdivia Commune, Valdivia Province, Los Ríos Region, Chile |
Undergrounding of the city centre, Ramírez Street
The project was carried out for the undergrounding of the medium and low voltage lines in Ramírez Street, between Matta and Cochrane, for which the design of underground vaults was carried out, to house up to 2 transformers of 1 MVA, Osorno.
Amount Investment | Date | Place |
---|---|---|
$1.200.000.000 | January 2007 | Osorno Commune, Osorno Province, Los Lagos Region, Chile |
Undergrounding of the city centre, Antonio Varas Street
The project for the undergrounding of the medium and low voltage lines in Antonio Varas street, between Lota and Germania, was carried out, for which the design of underground vaults was made, to house up to 2 transformers of 1 MVA. Puerto Montt.
Amount Investment | Date | Place |
---|---|---|
$4.000.000.000 | February 2007 | Commune of Puerto Montt, province of Llanquihue, Los Lagos Region, Chile |
23 kV EW feeder cabling system, Compañía Minera Barrick Zaldivar
Basic and detailed engineering was developed for the replacement of the Zaldivar main S/E feeders with 23 kV cables. Antofagasta
Amount Investment | Date | Place |
---|---|---|
$1.500.000.000 | June and July 2008 | Domeyko mountain range, Antofagasta province, Antofagasta Region, Chile |
CGE Power Transformer Specification
Specification of several transformers of 110 / 23 - 15 - 13.2 kV 30 MVA and 66 / 23 - 15 - 13.2 kV for CGE Transmission facilities.
Amount Investment | Date | Place |
---|---|---|
$3.000.000.000 | – | – |
Dismantling supervision and diagnostics for SQM
Basic and detailed engineering was developed for the replacement of the Zaldivar main S/E feeders with 23 kV cables. Antofagasta
Amount Investment | Date | Place |
---|---|---|
$500.000.000 | – | – |
CONTACT
Av. Nueva Providencia 1945, Office 807 – Providencia, Santiago of Chile
📠 Phone (+56 2) 22476003 – (+56 2) 33401836 – 📲 Cellphone (+56 9) 8351 9293
contacto@electrodharma.com
© 2024 ELECTRODHARMA. All rights reserved